What a crazy week last week was for the East Coast. Our best wishes go out to those who have been affected by hurricane Sandy. We were lucky that we only got a bit of wind (nothing out of the ordinary for Nova Scotia), and a lot of rain.

Even with the bleak weather forecast the team maintained a steady pace in Kingsburg. Kingsburg 1 in the photo above has the roofing completed as well as the tar paper.
Kingburg 2
Below is a shot showing the floor joists installed.

Another view of the floor joists. The scenery from this house will be spectacular.

Last week we showed you the wall construction of the bunkhouse. In the photo below you can see the mezzanine beginning to take shape.

The photo below was taken from the main floor of the bunkhouse with the opening in the mezzanine in the background. The design will afford the space a feeling of open space with its high ceilings.

Later this week we’ll profile a local company that provides some really interesting architectural building products. Stay tuned and thanks for reading!